Difference between revisions of "Heuristic Evaluation Task"
(→Phase 1 - Preparation (10 minutes)) |
(→Phase 1 - Preparation (10 minutes)) |
||
Line 7: | Line 7: | ||
* selects a software, an app, or a website to be evaluated by another team, | * selects a software, an app, or a website to be evaluated by another team, | ||
* defines a set of evaluation criteria (heuristics) for the evaluation of the product or service selected above, | * defines a set of evaluation criteria (heuristics) for the evaluation of the product or service selected above, | ||
− | (I recommend using 3 to 5 criteria for this | + | (I recommend using 3 to 5 criteria for this exercise. You can use the Usability Heuristic from the Nielsen and Norman Group or a subset of them) |
https://www.nngroup.com/articles/ten-usability-heuristics/ | https://www.nngroup.com/articles/ten-usability-heuristics/ | ||
* provides a short explanation of the product and the evaluation criteria. | * provides a short explanation of the product and the evaluation criteria. |
Latest revision as of 08:27, 26 May 2025
Work in the project teams.
Each team has two roles: Client and Contractor
Phase 1 - Preparation (10 minutes)
In this phase, the teams are in the client role. As a client, each team...
- selects a software, an app, or a website to be evaluated by another team,
- defines a set of evaluation criteria (heuristics) for the evaluation of the product or service selected above,
(I recommend using 3 to 5 criteria for this exercise. You can use the Usability Heuristic from the Nielsen and Norman Group or a subset of them) https://www.nngroup.com/articles/ten-usability-heuristics/
- provides a short explanation of the product and the evaluation criteria.
Please take notes and document everything on any (virtual) White-Board or other shareable document.
Phase 2 - Evaluation (45 minutes)
In this phase, the teams are in the contractor role. As a contractor, each team ...
- reads the explanations from the other team,
- creates a protocol sheet for the evaluation,
- each team member explores thoroughly the interface independently of each other, and
- compares the dialog elements with the heuristics using their expert knowledge, and
- collect the findings in the protocol sheet (Usability problem list)
- the team assesses the severity of the findings (individually or as a group),
- compiles an aggregated list of findings together with severity assessment,
- hands the findings back to the client.
Phase 3 - Feedback (10 minutes)
Back to the client role. As a client ...
- read the reported findings,
- give a short talk (5 minutes) about the most important needs for improvement.
The contractor will be asked to comment.